|
||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Level II Studies | ||||||||||||||||||
Sem. | Gr. | 2024 06.17 |
2024 06.18 |
2024 06.19 |
2024 06.20 |
2024 06.21 |
2024 06.22 |
2024 06.24 |
2024 06.25 |
2024 06.26 |
2024 06.27 |
2024 06.28 |
2024 06.29 |
|||||
APSG 12-15 102 |
APSG 12-15 120 |
|||||||||||||||||
CB | MISK 12-15 105-AR |
BSC 10-12 6 |
MWS 15-18 168 |
MISK 10-12 168 |
MWS 10-12 168 |
BSC 10-12 6 |
||||||||||||
EIF | PSSV 8-10 168 |
SPOM 12-15 102 |
PSSV 12-15 102 |
SPOM 12-15 102 |
||||||||||||||
EIM | SZAE 12-15 120 |
TRM 10-12 120 |
MMC 12-15 170 |
TMN 12-15 168 |
MWS 15-18 168 |
MBI 10-12 133 |
SZAE 8-10 164 |
TRM 10-12 164 |
MWS 10-12 168 |
MBI 10-12 118-AL |
MMC 8-10 6 |
TMN 12-15 168 |
||||||
IBM | INGE 10-12 164 |
TRM 10-12 120 |
MMC 12-15 170 |
MBI 10-12 133 |
INGE 8-10 108 |
TRM 10-12 164 |
MBI 10-12 118-AL |
MMC 8-10 6 |
||||||||||
IR | BEKO 12-15 102 |
STOP 10-12 102 |
SPOM 12-15 102 |
BEKO 12-15 103 |
SPOM 12-15 102 |
STOP 10-12 170 |
||||||||||||
ISI | PS 10-12 017B |
KODA 12-15 202 |
APSI 8-10 105-AR |
POBR 12-15 105-AR |
MBI 10-12 133 |
PS 10-12 17 |
KODA 12-15 17 |
APSI 12-15 102 |
POBR 8-10 170 |
|||||||||
MBI 10-12 118-AL |
||||||||||||||||||
MSE | MOZA 12-15 102 |
MWS 15-18 168 |
MWS 10-12 168 |
MOZA 15-18 108 |
ZZSN 12-15 162 |
|||||||||||||
ZZSN 15-18 161 |
||||||||||||||||||
SEW | ITK 10-12 6 |
SWIS 10-12 108 |
KWABI 10-12 102 |
MOZA 12-15 102 |
NEL 10-12 108 |
WBIK 12-15 6 |
NEL 8-10 102 |
ITK 12-15 103 |
MOZA 15-18 108 |
WBIK 10-12 102 |
KWABI 12-15 6 |
|||||||
SWIS 10-12 202 |
||||||||||||||||||
SID | KODA 12-15 202 |
PSD 15-18 202 |
PTI 8-10 118-AL |
MWS 15-18 168 |
KODA 12-15 17 |
MWS 10-12 168 |
PTI 12-15 118-AL |
|||||||||||
PSD 12-15 6 |
||||||||||||||||||
TBM | SLID 12-15 6 |
SLID 12-15 6 |
||||||||||||||||
TIC | BEST 8-10 017B |
AIR 12-15 6 |
AIR 12-15 6 |
BEST 12-15 168 |